00927

Scott Point Infrastructure Works $7.5m (current)

Subdivision development including drainage infrastructure
Client: Scott Point Estate LP 

This subdivision development includes the following drainage infrastructure; 
  • 3.2km Stormwater pipelines, manholes, lot connections, outlet construction 
  • 3.2km Wastewater pipelines, manholes, lot connections, outlet structure 
  • 5.2km Water supply pipelines, valves, hydrants, markers and connections to Watercare network 
  • Wastewater rising main with air valves and bio filters 
  • Wastewater pump station, pipework, storage tanks
1footer Civil Contractors New Zealand 1footer NZ Transport Agency
ISO9001-7131footer Site Safe Member
NZS4801-319
1footer Site-Wise-logo
1footer ACC Logo 1footer Canterbury Rebuild Charter
   

HEAD OFFICE

18 Manchester Place, Te Rapa Hamilton 3200
PO Box 20463, Te Rapa Hamilton 3241

EMAIL US    Follow us on Facebook