00947

Rototuna School Enabling Works $5.7m, including new road construction (complete)

Enabling Works for new school, Rototuna, Hamilton
CLIENT: Arrow International Ltd (Main Contractor)

All enabling works, erosion and settlement ponds, outfall structures, earth bund, open cut swale drains, site clearance, temporary access roads and initial preload of an area 6,500m2.

See our Feature Project. 

Additional to the enabling works, Schick were awarded the new design and build Rototuna School Collector Road construction contract for Hamilton City Council. 

CLIENT: Hamilton City Council 

Full depth construction from greenfield up to 940mm, which included subgrade trimming and ground improvement layers of rock and geofabrics, AP65 placement and TNZ40 (over 20,000m3 were placed around islands) and traffic lights. Once the pavement was complete a Grade 5 membrane seal was finished with AC14 asphalt.   Scope also included installation of several complex deep lines. 550m 1200 dia concrete stormwater line with 1800 dia manholes with an average depth of 2.45m and 550m of 225 dia PVC wastewater line with 1200 dia manholes with average depth of 4m. 

The success of this contract led to the addition of  other variation work and the North City/ Bourne Brook intersection upgrade amounting to $150,000.00






 
1footer Civil Contractors New Zealand 1footer NZ Transport Agency
ISO9001-7131footer Site Safe Member
NZS4801-319
1footer Site-Wise-logo
1footer ACC Logo 1footer Canterbury Rebuild Charter
   

HEAD OFFICE

18 Manchester Place, Te Rapa Hamilton 3200
PO Box 20463, Te Rapa Hamilton 3241

EMAIL US    Follow us on Facebook