Earthworks

 
pairere-bulk-earthworks Pairere Curves Realignment 
Client: Transit New Zealand            Scale: $2.7M
        
Principle earthworks subcontractor to Transfield Services: involved bulk cut to structural fill, cut to waste of 300,000m³ ryolite, ash and pumice type material. Schick engaged C&R Developments to cut the R2 rock approximately 80,000m³. Work also included bulk topsoil striping & regrassing, sediment control and silt pond construction. We demonstrated ability to complete bulk earthworks to a high standard in a limited time frame. Worked within resource consent with weekly inspections from Environment Waikato.
 
avalon-bypass Avalon Drive Bypass
Client: Transit New Zealand            Scale: $3.8M

Primary earthworks subcontractor to Brian Perry Civil: construction of 3km of SH1 through residential and industrial land (green fields) including underpasses, bridges earthworks and pavement. Performed 175,000m³ of earthworks including bulk cut to structural fill 40,000m³, cut to landscape fill 30,000m³, and cut to waste trucked off site 100,000m³, imported pit sand fill 24,000m³. Works also included importing 15,000m³ topsoil and grassing over 30,000m². Worked in with multiple stakeholders. 
 
transpower-pylon-line 400kV line + Wairaki to Artimuri Line
Client: Transpower Alliance            Scale: $12M + $5M

Contracted to Transpower Alliance for the access roads & foundation platform construction, stringing access & stringing platforms for the Whakamaru to Brownhill 400kV pylon line. Works involved construction of 200 access tracks & building platforms across farm & forestry land including bulk earthworks, drainage, pavement construction, sediment & erosion controls, fencing, traffic management, quality assurance testing, site set out and as-builts. 

 
raglan-waste-water-treatment-plant Raglan Waste Water Treatment Plant 
Client: Waikato District Council            Scale: $1.7M

Bulk earthworks contract to form new ponds for waste water treatment plant at Raglan. Included 150,000m³ cut to fill & cut to waste to form 3 main ponds and 2 smaller ponds. Significant sediment & erosion controls. 6,000m² concrete wave protection. Haul road construction. Works required drying of wet ash material and significant cut to waste of very wet ash.
 
1footer Civil Contractors New Zealand 1footer NZ Transport Agency
Telarc QualityTelarc-14001 (1)1footer Site Safe Member 1footer Site-Wise-logo1footer ACC Logo1footer Canterbury Rebuild Charter
   

HEAD OFFICE

18 Manchester Place, Te Rapa Hamilton 3200
PO Box 20463, Te Rapa Hamilton 3241

EMAIL US    Follow us on Facebook