Home > Our Services > Civil Structures
FREEPHONE 0800 4 SCHICK
|
![]() |
SH 29 - Tauriko Retaining Wall Client: Tauranga City Council Scale: $1M Construction of a 32 pole retaining wall including the design and installation of 61 Reid Bar tie back anchors. Construction of 350m long, 2m deep cut off drains. Removal of 1,000m³ contaminated material to waste and benching / construction of 3,000m³ imported fill to the slip face including sub soil drainage. Reconstruction of pavement, guard rail and fencing. Renewal of 150mm diameter water main. Relocation of power pole. Level 2 traffic management including lane diversion for 4 months. |
![]() |
Cliff Road Palisade Wall Client: Auckland City Council Scale: $2M Works involved the stabilization of Cliff Road on the coastal zone of St Heliers. Schick completed 70 reinforced concrete piles (15m deep) with Reid Bar tie backs and 32 reinforced concrete piles (6m deep) with dead man ties backs. Works also included significant storm water alterations, tunnelling and full pavement reconstruction. |
![]() |
Taupo Water Treatment Plant Retaining Wall Client: Taupo District Council Scale: $1.1M Initially demolished and removed existing concrete tank. Excavation from cliff face including vegetation and trees,10m deep cut to waste to retained face. Installation of soil nails: 190 x 12m long Reid Bar Anchors, 200mm thick shotcrete wall-face. Drainage, relocation of footpath and traffic control required. |
![]() |
Central Hawkes Bay Bridge Maintenance Contracts Client: Central Hawkes Bay District Council Scale: $700,000 Involved remedial works on bridge structures and abutments including gabion basket stabilizations, crack injections, bridge deck joint replacement, concrete spalling repairs, stream diversion works and concrete lined Armco culverts. |