00927

Scott Point Infrastructure Works $7.5m (current)

Subdivision development including drainage infrastructure
Client: Scott Point Estate LP 

This subdivision development includes the following drainage infrastructure; 
  • 3.2km Stormwater pipelines, manholes, lot connections, outlet construction 
  • 3.2km Wastewater pipelines, manholes, lot connections, outlet structure 
  • 5.2km Water supply pipelines, valves, hydrants, markers and connections to Watercare network 
  • Wastewater rising main with air valves and bio filters 
  • Wastewater pump station, pipework, storage tanks