Construction of new pump station to multiple land developments in the catchment area
Client:Blue Wallace Surveyors / Hamilton City Council
Installation of a 2.3m diameter, 4.3 deep wet well chamber and dry valve chamber. 130m of 130mm diameter PE rising main and construction associated with gravity wastewater infrastructure connected to the pump station. The completion of the pump station was critical to the completion of other land developments within the catchment area.
Installation of a 2.3m diameter, 4.3 deep wet well chamber and dry valve chamber. 130m of 130mm diameter PE rising main and construction associated with gravity wastewater infrastructure connected to the pump station. The completion of the pump station was critical to the completion of other land developments within the catchment area.