Staged bulk earthworks for section shaping and civil infrastructure installation
CLIENT: Dixon Homes Ltd
A residential subdivision comprising bulk earthworks, stormwater, wastewater and potable water reticulation, stormwater pond, utility services and pavement construction.
The detailed scope includes;
16,000m3 bulk earthworks; 5,250 m3 topsoil strip, shape to profile and placement of topsoil over lots and berms including landscaping and grass.
Construction of a permanent stormwater pond comprising dam structure, primary outlet infrastructure in the existing gully head
Sediment control
Construction of retaining walls
Construct 500m of wastewater drainage and manholes including all service connections.
Construct 600m of stormwater drainage from 100mm dia.to 900mm dia.including manholes and catchpits
Construct 900m of kerb and channel comprising vertical, mountable and nib kerb
Construct 900 m2 of footpath
Supply, lay, compact and trim pavement and provide Hot mix surface over first coat chip seal (grade 5 chip) on all roads.
Install 430m of 150 mPVC watermain and 400m of 63mm MPDE rider main together with sluice valves, peet valves, hydrants and commissioning