Rototuna Town Centre Stage 3 Physical Works $1.4m (complete)
Formation of drain profile to create linear wetlands and stormwater drain system
CLIENT:
Kirkdale Investments Ltd
Scope of works included;
Site clearance
Erosion and Sediment Control
Bulk Earthworks (4,000m3)
Excavation (23,000m3)
Formation of drains - linear wetlands
, southern d
rain
0.5km Stormwater and Wastewate
New timber footbridge
New concrete footpath
Landscaping, planting and fencing