Te Rapa Gateway Stage 1B & 2 $4.5m (current)
Civil construction works for industrial development
CLIENT:
Te Rapa Gateway Limited
The project includes;
site clearing
sediment and erosion control
bulk earthworks (~30,000m3)
pavement, roading, signage and road marking
stormwater reticulation pipework 375mm dia. to 975mm dia. and manholes to 1650mm dia.
150mm UPVC wastewater pipework upto 4.5m deep
1.6km water reticulation including hydrants and valves and connection to existing council infrastructure
topsoiling and grassing