Previous
						
						
														Next
						
												Project Details
Client
							Hawkins Construction (Main Contractor)						
				Value
$698,000
Status
Complete
							Schick’s work included:
				- Removal of existing stump and root systems, including backfill to profile and compaction
- Excavation of the building platform and backfill
- All works associated with the excavation and formation of new roading and carpark including kerbing, asphalt, line marking, signage and swales
- Excavation and installation of new wastewater and stormwater drainage including manholes and stormwater retention system and connection to existing system.
 
								 
													 
													