Project Details
Client
Thames-Coromandel District Council
Location
Whangamatā
Value
$2.5 million
STATUS
Completed June 2026
Schick completed approximately 750m of stormwater upgrades along Hetherington Road, replacing the existing 450mm pipeline with new 900mm and 1050mm pipes to improve the capacity and performance of the network.
The works were undertaken on a live stormwater system within a major access road, requiring careful staging and traffic management to maintain network operation and safe access for the surrounding community.
Existing services presented a key challenge, including two 11kV power supply crossings and several unidentified water services encountered within the proposed alignment. Schick adapted the construction sequence to allow drainage works to continue while service relocations were coordinated, minimising disruption to the programme.
Challenging ground conditions and restricted working areas also required engineered shoring systems to safely undertake the drainage works. An approved methodology was developed in collaboration with the asset owner for works near overhead power lines, enabling construction to proceed safely within the constrained corridor.
Works included:
- Replacement and upsizing of approximately 750m of stormwater pipeline
- Installation of 900mm and 1050mm stormwater pipes
- Construction on and around a live stormwater network
- Engineered excavation and shoring systems
- Management and coordination of existing underground and overhead services
- Traffic management and maintenance of public access
- Road and surrounding area reinstatement